Skip To Content

Connection Manual

Connection Manual for Systems Operated by the MHOG Utility Department

The MHOG Utility Department oversees the operation and maintenance of the municipal water system in Marion and Howell Townships, and the municipal water and sanitary sewer systems in Genoa and Oceola Townships.

Each section of the Connection Manual is available for download in the list of related documents at the right-hand side of this page.ย  A complete copy can be found below.

full-connection-manual MHOG Connection Manual

section-1-general-information SECTION 1 - GENERAL INFORMATION

INFORMATION INCLUDED IN THIS SECTION:

  • SUMMARY OF INTERGOVERNMENTAL RELATIONSHIP
  • DESCRIPTION OF MUNICIPAL UTILITIES
  • DESCRIPTION OF PRIVATE SYSTEM COMPONENTS
  • DESCRIPTION OF MUNICIPAL SYSTEMS NOT COVERED BY THIS MANUAL
  • CONTACT INFORMATION BY MUNICIPALITY
  • PRE-CONNECTION PHASE - TOWNSHIP REQUIREMENTS & SERVICES PROVIDED BY MHOG

SECTION 2 - WATER MAIN CONNECTIONS & MODIFICATIONS

section-21-purchase-of-a-water-meter SECTION 2.1 - PURCHASE OF A WATER METER

  • METER PACKAGE PURCHASE
  • IRRIGATION METER PACKAGE
  • INSTALLATION REQUIREMENTS

section-22-new-water-service-connection SECTION 2.2 - NEW WATER SERVICE CONNECTION

section-23-new-fire-suppression-connection SECTION 2.3 - NEW FIRE SUPPRESSION CONNECTION

section-24-abandonment-of-water-service SECTION 2.4 - ABANDONMENT OF WATER SERVICE

section-25-non-municipal-irrigation-source SECTION 2.5 - NON-MUNICIPAL IRRIGATION SOURCE

section-3-system-expansion-requirements SECTION 3 - SYSTEM EXPANSION REQUIREMENTS

INFORMATION INCLUDED IN THIS SECTION:

  • IMPACT DETERMINATION PROCESS
  • CONSTRUCTION PLAN & PERMIT REQUIREMENTS
  • CONSTRUCTION INSPECTION REQUIREMENTS
  • CONSTRUCTION CLOSEOUT PROCEDURES

section-4-mhog-construction-fee-schedule SECTION 4 - MHOG CONSTRUCTION FEE SCHEDULE

INFORMATION INCLUDED IN THIS SECTION:

  • MHOG FEES
  • TABLE 1
  • RESIDENTIAL OR BUSINESS
  • SYSTEM EXPANSION
  • ESCROW FEES (APPLICABLE TO SYSTEM EXPANSION PROJECTS ONLY)
  • MHOG CONSTRUCTION FEE DESCRIPTIONS?

SECTION 5 - SANITARY SEWER CONNECTIONS & MODIFICATIONS

section-51-new-gravity-service-connection SECTION 5.1 - NEW GRAVITY SERVICE CONNECTION

  • CONNECT TO AN EXISTING LEAD
  • MHOG INSTALLS NEW LEAD
  • PROPERTY OWNER INSTALLS NEW LEAD

section-52-new-grinder-pump-connection SECTION 5.2 - NEW GRINDER PUMP CONNECTION

  • CONNECT TO AN EXISTING CURB STOP
  • MHOG INSTALLS NEW CURB STOP
  • CONNECT TO GRAVITY SEWER
  • PUMP INSTALLATION REQUIREMENTS

section-53-abandonment-of-existing-grinder-pump SECTION 5.3 - ABANDONMENT OF EXISTING GRINDER PUMP

section-54-abandonment-of-gravity-sewer-service SECTION 5.4 - ABANDONMENT OF GRAVITY SEWER SERVICE

ATTACHMENTS

attachment-1-water-service-connection-to-home-or-business ATTACHMENT 1: WATER SERVICE CONNECTION TO HOME OR BUSINESS

attachment-2-fire-suppression-with-hydrants ATTACHMENT 2: FIRE SUPPRESSION WITH HYDRANTS

attachment-3-grinder-pump-system-to-home-or-business ATTACHMENT 3: GRINDER PUMP SYSTEM TO HOME OR BUSINESS

attachment-4-gravity-lead-service-to-home-or-business ATTACHMENT 4: GRAVITY LEAD SERVICE TO HOME OR BUSINESS

attachment-5-developer-plan-review-flow-diagram ATTACHMENT 5: DEVELOPER PLAN REVIEW FLOW DIAGRAM

APPENDIX

appendix-a-meter-package-form-cost APPENDIX A: METER PACKAGE FORM & COST

appendix-b-sample-grinder-pump-easement APPENDIX B: SAMPLE GRINDER PUMP EASEMENT

appendix-c-grinder-pump-fee-table APPENDIX C: GRINDER PUMP FEE TABLE

appendix-d-grinder-pump-installation-guide-appendix-d-grinder-pump-installation-guide APPENDIX D: GRINDER PUMP INSTALLATION GUIDE APPENDIX D: GRINDER PUMP INSTALLATION GUIDE

appendix-e-sample-mhog-invoice-for-system-expansion-project APPENDIX E: SAMPLE MHOG INVOICE FOR SYSTEM EXPANSION PROJECT

appendix-f-hydrant-meter-rental-forms APPENDIX F: HYDRANT METER RENTAL FORMS

appendix-g-application-for-non-municipal-irrigation-source APPENDIX G: APPLICATION FOR NON-MUNICIPAL IRRIGATION SOURCE

ATTENTION to our MHOG Grinder Pump Customers affected by the Storm

A reminder to please limit your water usage if you are without power.

Please call us with any questions you may have (800) 881-4109.

MHOG Office closed Thursday July 2

As a result of needed well repairs, the MHOG office will be closed to the public on Thursday, July 2nd. Following Friday's scheduled observance of July 4th, the MHOG office will reopen for regular business at 9:00 A.M. Monday.

We apologize for any inconvenience this may cause and thank you for your patience understanding while these needed repairs are completed